Investor: Krumce Hristov Materials used: Vrska U, Acelerator C, Reparatur Malter, Hidromal, Addingpoks Akva, Adingcolor RB
Description: Installation of materials with instructions
Used materials: Eksmal, Bond-U, Reparatur plaster, Hidrokol SP, Adingpoks N, Hidrofob Fluid.
The building was finished in 2013.