Investor: Ading AD Skopje
Materials used: Hidrozim T
Investor: Tinex-MT DOOEL Skopje
Materials used: Reparatur Malter, Adingrost, Antikorozin E, Solvent P, Bond U
Investor: Strabag AG Skopje
Materials used: Antikorozin BB
Investor: Seke DOOEL Prilep
Materials used: Solvent P, Antiкorozin E
Investor: Makperol AD, Skopje
Materials used:
Ading: Antikorozin E, Solvent P
Buznis Centar Ading: Stancolac Epoxy primer 812, Stancolac 912 Epoxy Intermediate, Stancolac 5008 PU Coating
Description: Repair of bridge B3 - "Ring road Kocani"
Investor: Granit AD Skopje
Used materials: Reparatur penetrat, Reparatur malter, Eksmal, Antikorozin BB, Bitek A, Bitulit 4 mm.
Description: Repair and anticorrosive protection / Waterproofing works on roadway plate / Expansion joints - Bridge Sretkov Dol, section Gostivar - Kolari
Investor: Granit AD Skopje
Used Materials: Reparatur penetrat, Reparatur malter, Eskmal, Adingpoks I, Antikorozin BB
Summary: Anti-corrosion protection of bridges on the section Shtip - Radovish with Antikorozin BB
>> PhotosInvestor: Strabag AG, Subsidiary Skopje
Operating activities: Repair and protection of concrete surfaces and temporary watercourse diversion
>> PhotosIndustrial zone Bunardzik
Investor: Aktiva Engineering
Description: anti-corrosion protection of concrete elements
Used materials: Antikorozin BB, Reparatur malter, Hidroglet F
The building was completed in 2009.
>> PhotosInvestor: C.C. Mavrovo, C.C. Beton, C.C. Pelagonija
Description: anticorrosive protection of concrete elements
The building was completed in 2004.
Investor: C.C. Mavrovo
Description: anticorrosive protection of concrete elements
The building was completed in 2002
Investor: Most Stroj
Description: anticorrosive protection of concrete elements
The building was completed in 2002.
Investor: C.C. Granit
Description: Anticorrosive protection of concrete elements
The building was completed in 2002.
Investor: C.C. Mavrovo
Description: Anticorrosive protection of concrete elements
The building was completed in 2000.
Investor: Most Stroj
Description: anticorrosive protection of concrete elements
The building was completed in 1999.
Investor: C.C. Beton
Description: anticorrosive protection of concrete elements
The building was completed in 1998.